Your new bill explained

Your new bill explained


This page will help you find brief information referring to the fields on your bill
1
x
PPC Customer Service
Address of the PPC Office pertaining your property 

Telephone number for PPC’s Customers service provision referring to any commercial issue (charges, bills, change of name etc.)
2
x
HEDNO’s Customers Service
Information:  customers’ contact info call center for issues referring to services provided by the Network Operator – HEDNO (such as first time customer, power supply rearrangement, increasing power supply, technical issues)
Outages: HEDNO’s customers’ contact info call center for power supply problems (outages) 
Metering: HEDNO’s customers’ contact info call center for issues relative to metering 

3
x
Type of bill
“ACTUAL” (BILL based on actual reading) : The bill includes the amount corresponding to the customer's electric usage for the entire consumption period (quarterly or monthly), minus the amount already charged on the interim Estimated Bill (“ESTIMATED”) in the field “ΑΞΙΑ ΡΕΥΜΑΤΟΣ ΕΝΑΝΤΙ” (ESTIMATED ELECTRICITY USAGE).

For customers who are beneficiaries of the Social Residential Tariff (KOT), there is a specific indication “ΚΟΙΝΩΝΙΚΟ ΤΙΜΟΛΟΓΙΟ” (Social Residential Tariff) provided that the Actual Bill is calculated based on the prices of the Social Residential Tariff.

“ESTIMATED” (BILL based on estimated reading): The bill is calculated based on the customer’s usage history such electricity consumption for the billing period of the previous year and the usage for the current year. 

“EXCEPTIONAL”: bill issued on dates that are not included in the regular dates of metering (e.g. due to bill correction).

“FINAL”: bill issued following the Termination of the Power Supply Contract.

4
x
Tariff
Type of Tariff provided (e.g. Γ1- Residential non-off-peak Tariff, Γ1Ν-Residential Off-peak Tariff, Γ21-General Energy/Commercial Tariff κλπ) according to the signed Power Supply Contract. In cases of customers who are integrated into the Vulnerable Customers Registry, or they are beneficiaries of the Social Residential Tariff, there is additional relevant indication depending on the integration category (ΚΟΤ/Α, ΚΟΤ/Β, ΕΥΑ/Η etc.).
5
x
Electricity consumption period and number of days
Electricity consumption period for which you are being charged on the current bill. Under it, the exact number of days for the billing period is stated.
6
x
Consumption
The total quantity of power consumed within the specific consumption period.
7
x
Business Partner Code
Code necessary for your registration in eΔΕΗ in order to receive your bill electronically.
8
x
Contract Account
It is unique for each customer. Each time you contact PPC you should know the Number of the Bill Contract Account you are referring for more rapid provision of services.
9
x
Bill serial number and issuance date
Bill serial number and issuance date constitute tax information. 
10
x
Guarantee
The amount of deposit paid upon the signature date of the power supply contract with possible readjustment based on the Supply Code.
11
x
Bill is paid by (name of the Bank)
It is mentioned when customers have active bank order for the payment of their bills.
12
x
E-Payment Code
Required for the bill payment via ΑΤΜs, phone-banking and e-banking. 
13
x
Expiration payment date
Date until which you can pay your bill so as to be considered that the bill is paid within the deadline.
14
x
Name and Surname
Name and Surname of the contracting party and the bill mailing address.
15
x
Supply number
Supply number is unique for each property. For your facilitation, you should always know the Supply Number of the property in question, each time you contact PPC. The number of the supply is mentioned on the metal plate located on your meter.
16
x
Address of the property
Address of the property supplied with electricity by the specific supply point.
17
x
Next Metering Date
Date on which the next metering of the property’s meter indication will be realized by HEDNO.
18
x
All charges in brief
All the charges of your bill are stated in brief. Their analysis is stated at the back of the bill.
19
x
PPC
In this field, the electricity charges are calculated based on the electricity consumption and the tariff currently applied. That is, it includes the cost as well as the rest of the expenses of PPC  for the electricity power supply to customers. Power supply billing is included in the Bill based on the actual reading ("ACTUAL") and this is the reason why on the Bill based on estimated reading ("ESTIMATED"), this field is empty. For more information on the billing method, please see the category "FAQ’s".
20
x
IPTO-HEDNO
IPTO: Power Transmission System
Covers IPTO’s expenses (Independent Power Transmission Operator) for the operation, maintenance and development of the HV Transmission Network (e.g. pylons) so as to assure the country’s electricity supply.

HEDNO: Electricity Distribution Network
It covers HEDNO’s expenses for the operation, maintenance and development of the MV and LV Distribution Network so as to assure normal and uninterrupted power supply of the properties.
21
x
For Services of General Interest (SGI):
They refer to charges to all consumers for services such as power supply to customers of the non-interconnected islands and  provision of special tariffs to large families and beneficiaries of the Social Residential Tariff.
22
x
Special Duty of Greenhouse Gas Emissions Reduction (ETMEAR):
special Duty for the enhancement of the power generation from Renewable Energy Sources (RES).
23
x
Other Charges
Charges imposed by the legislation of good operation of the Market.
24
x
Amount charged/credited in the “Estimated” Bill
Τhe amount charged/credited in the “Estimated” Bill (Bill based on estimated reading) is mentioned in this field.
25
x
Miscellaneous
It includes the rest of the charges referring to:
A) power supply  apart from the billing of consumed energy, regulated charges as well as charges of the “Estimated bill” amount and
 B) the charges rendered to the state 

Α)   Charges relevant to electricity usage
a)   charges resulting from selling generation power from photovoltaic systems.
b)  corrective registrations
c)   amounts rounded-off
d)    charges for works carried out on the Network (πχ. Meter check, rearrangement of supply points, blown fuses etc.)

Β)  Charges rendered to the state
a)   «ΕΦΚ (L.3336/05)» (Excise Duty): PPC collects the Excise Duty in the electricity bills and renders it to the State.  The Excise Duty is charged only to Bills based on actual reading (“ACTUAL”) and it is calculated based on consumption.
b)   «ΕΙΔ. ΤΕΛΟΣ 5‰ (SPECIAL DUTY 5‰) (L.2093/92)»: PPC collects the Special Duty in the electricity bills and renders it to the State. The Special Duty 5‰ is calculated in the Bills based on actual reading (“ACTUAL”) based on the consumed electricity increased by the Excise duty.

26
x
VAT
Total amount, VAT included, to be paid for electricity. It is noted that, Supply Charges, Regulated Charges and Excise duty and the rounded-off amounts as well as charges for third parties (Municipal fees, Municipal tax, Real Estate Tax & ERT) are not subject to VAT. 
27
x
Municipal Charges
Charges for third parties (Municipal fees, Municipal tax, Real Estate Tax). The amounts for the Municipality are calculated in each Bill whether it is an Actual or an Estimated Bill. 

The amount is calculated as follows: 

a) For Municipal Fees (ΔΤ), Municipal Taxes (ΔΦ) : 
    (sq m of property) Χ (MF or MT coefficient) Χ (billing days) 
                                     365 days 

b) For Real Estate Tax (RET – ΤΑΠ) : 
    (sq m of property) Χ (zone price) Χ (age) Χ (RET coefficient) Χ (billing days) 
                                                365 ys 

28
x
ERT (Hellenic Broadcasting Corporation Societe Anonyme)
For ERT : 
    Annual charge for ERT x billing days 
                  365 days  

29
x
Total amount due:
The sum of all charges included in the electricity bill as well as any previous unpaid bill amounts. 
  1. 1. PPC Customer Service
    Address of the PPC Office pertaining your property 

    Telephone number for PPC’s Customers service provision referring to any commercial issue (charges, bills, change of name etc.)
  2. 2. HEDNO’s Customers Service
    Information:  customers’ contact info call center for issues referring to services provided by the Network Operator – HEDNO (such as first time customer, power supply rearrangement, increasing power supply, technical issues)
    Outages: HEDNO’s customers’ contact info call center for power supply problems (outages) 
    Metering: HEDNO’s customers’ contact info call center for issues relative to metering 

  3. 3. Type of bill
    “ACTUAL” (BILL based on actual reading) : The bill includes the amount corresponding to the customer's electric usage for the entire consumption period (quarterly or monthly), minus the amount already charged on the interim Estimated Bill (“ESTIMATED”) in the field “ΑΞΙΑ ΡΕΥΜΑΤΟΣ ΕΝΑΝΤΙ” (ESTIMATED ELECTRICITY USAGE).

    For customers who are beneficiaries of the Social Residential Tariff (KOT), there is a specific indication “ΚΟΙΝΩΝΙΚΟ ΤΙΜΟΛΟΓΙΟ” (Social Residential Tariff) provided that the Actual Bill is calculated based on the prices of the Social Residential Tariff.

    “ESTIMATED” (BILL based on estimated reading): The bill is calculated based on the customer’s usage history such electricity consumption for the billing period of the previous year and the usage for the current year. 

    “EXCEPTIONAL”: bill issued on dates that are not included in the regular dates of metering (e.g. due to bill correction).

    “FINAL”: bill issued following the Termination of the Power Supply Contract.

  4. 4. Tariff
    Type of Tariff provided (e.g. Γ1- Residential non-off-peak Tariff, Γ1Ν-Residential Off-peak Tariff, Γ21-General Energy/Commercial Tariff κλπ) according to the signed Power Supply Contract. In cases of customers who are integrated into the Vulnerable Customers Registry, or they are beneficiaries of the Social Residential Tariff, there is additional relevant indication depending on the integration category (ΚΟΤ/Α, ΚΟΤ/Β, ΕΥΑ/Η etc.).
  5. 5. Electricity consumption period and number of days
    Electricity consumption period for which you are being charged on the current bill. Under it, the exact number of days for the billing period is stated.
  6. 6. Consumption
    The total quantity of power consumed within the specific consumption period.
  7. 7. Business Partner Code
    Code necessary for your registration in eΔΕΗ in order to receive your bill electronically.
  8. 8. Contract Account
    It is unique for each customer. Each time you contact PPC you should know the Number of the Bill Contract Account you are referring for more rapid provision of services.
  9. 9. Bill serial number and issuance date
    Bill serial number and issuance date constitute tax information. 
  10. 10. Guarantee
    The amount of deposit paid upon the signature date of the power supply contract with possible readjustment based on the Supply Code.
  11. 11. Bill is paid by (name of the Bank)
    It is mentioned when customers have active bank order for the payment of their bills.
  12. 12. E-Payment Code
    Required for the bill payment via ΑΤΜs, phone-banking and e-banking. 
  13. 13. Expiration payment date
    Date until which you can pay your bill so as to be considered that the bill is paid within the deadline.
  14. 14. Name and Surname
    Name and Surname of the contracting party and the bill mailing address.
  15. 15. Supply number
    Supply number is unique for each property. For your facilitation, you should always know the Supply Number of the property in question, each time you contact PPC. The number of the supply is mentioned on the metal plate located on your meter.
  16. 16. Address of the property
    Address of the property supplied with electricity by the specific supply point.
  17. 17. Next Metering Date
    Date on which the next metering of the property’s meter indication will be realized by HEDNO.
  18. 18. All charges in brief
    All the charges of your bill are stated in brief. Their analysis is stated at the back of the bill.
  19. 19. PPC
    In this field, the electricity charges are calculated based on the electricity consumption and the tariff currently applied. That is, it includes the cost as well as the rest of the expenses of PPC  for the electricity power supply to customers. Power supply billing is included in the Bill based on the actual reading ("ACTUAL") and this is the reason why on the Bill based on estimated reading ("ESTIMATED"), this field is empty. For more information on the billing method, please see the category "FAQ’s".
  20. 20. IPTO-HEDNO
    IPTO: Power Transmission System
    Covers IPTO’s expenses (Independent Power Transmission Operator) for the operation, maintenance and development of the HV Transmission Network (e.g. pylons) so as to assure the country’s electricity supply.

    HEDNO: Electricity Distribution Network
    It covers HEDNO’s expenses for the operation, maintenance and development of the MV and LV Distribution Network so as to assure normal and uninterrupted power supply of the properties.
  21. 21. For Services of General Interest (SGI):
    They refer to charges to all consumers for services such as power supply to customers of the non-interconnected islands and  provision of special tariffs to large families and beneficiaries of the Social Residential Tariff.
  22. 22. Special Duty of Greenhouse Gas Emissions Reduction (ETMEAR):
    special Duty for the enhancement of the power generation from Renewable Energy Sources (RES).
  23. 23. Other Charges
    Charges imposed by the legislation of good operation of the Market.
  24. 24. Amount charged/credited in the “Estimated” Bill
    Τhe amount charged/credited in the “Estimated” Bill (Bill based on estimated reading) is mentioned in this field.
  25. 25. Miscellaneous
    It includes the rest of the charges referring to:
    A) power supply  apart from the billing of consumed energy, regulated charges as well as charges of the “Estimated bill” amount and
     B) the charges rendered to the state 

    Α)   Charges relevant to electricity usage
    a)   charges resulting from selling generation power from photovoltaic systems.
    b)  corrective registrations
    c)   amounts rounded-off
    d)    charges for works carried out on the Network (πχ. Meter check, rearrangement of supply points, blown fuses etc.)

    Β)  Charges rendered to the state
    a)   «ΕΦΚ (L.3336/05)» (Excise Duty): PPC collects the Excise Duty in the electricity bills and renders it to the State.  The Excise Duty is charged only to Bills based on actual reading (“ACTUAL”) and it is calculated based on consumption.
    b)   «ΕΙΔ. ΤΕΛΟΣ 5‰ (SPECIAL DUTY 5‰) (L.2093/92)»: PPC collects the Special Duty in the electricity bills and renders it to the State. The Special Duty 5‰ is calculated in the Bills based on actual reading (“ACTUAL”) based on the consumed electricity increased by the Excise duty.

  26. 26. VAT
    Total amount, VAT included, to be paid for electricity. It is noted that, Supply Charges, Regulated Charges and Excise duty and the rounded-off amounts as well as charges for third parties (Municipal fees, Municipal tax, Real Estate Tax & ERT) are not subject to VAT. 
  27. 27. Municipal Charges
    Charges for third parties (Municipal fees, Municipal tax, Real Estate Tax). The amounts for the Municipality are calculated in each Bill whether it is an Actual or an Estimated Bill. 

    The amount is calculated as follows: 

    a) For Municipal Fees (ΔΤ), Municipal Taxes (ΔΦ) : 
        (sq m of property) Χ (MF or MT coefficient) Χ (billing days) 
                                         365 days 

    b) For Real Estate Tax (RET – ΤΑΠ) : 
        (sq m of property) Χ (zone price) Χ (age) Χ (RET coefficient) Χ (billing days) 
                                                    365 ys 

  28. 28. ERT (Hellenic Broadcasting Corporation Societe Anonyme)
    For ERT : 
        Annual charge for ERT x billing days 
                      365 days  

  29. 29. Total amount due:
    The sum of all charges included in the electricity bill as well as any previous unpaid bill amounts. 
30
x
The following are included in the table:
a) number of the meter and the type of indication (e.g. day or night).

b) meter(s) indications the total consumption. 

c)  Contractual Capacity (kVA):  as derived from the agreement of property connection with the network.  

d) Transformation Coefficient: The coefficient is multiplied with the meter reading consumption in order to calculate the actual electricity consumption. If, for example, this coefficient is 40 and the measured consumption is 100, then, 4.000 kWh (=40X100) were consumed during the specific billing period. This refers to supplies with contractual capacity of over 85 kVA. 

c) Power factor (cosφ): calculated for certain customer categories with high contractual capacity. It is calculated on the basis of the active and reactive energy usage. For all other customers, the power factor is considered to be equal to the unit (συνφ=1). 

d) Chargeable Demand (KW): calculated for power supplies greater than 35 kVA and indicates the maximum power required for the specific billing period. 

31
x
Meter indications registration
Information is provided referring to the period of time needed to register your meter indications (HEDNO’s service) so as to receive an Actual Bill and not an Estimated Bill.
32
x
PPC’s Supply Charges
In this field, the electricity charges are calculated based on the electricity consumption and the tariff currently applied. That is, it includes the cost as well as the rest of the expenses for the electricity supply to customers. Electricity billing is included in the Bill based on the actual reading ("ACTUAL") and this is the reason why on the Bill based on estimated reading ("ESTIMATED"), this field is empty. For more information, please see the category "FAQ’s".
33
x
Regulated Charges
Analysis of the charges applied to all customers using the National Electricity System, regardless of the electricity supplier selected. These charges include a) the use of the Transmission System (IPTO) b)the use of Electricity Distribution Network (HEDNO), b) Services of General Interest (SGI) and c) the special duty of Greenhouse Gas Emissions Reduction, destined to the development of green energy. The analysis of these charges is displayed only on the Bills based on actual reading ("ACTUAL") and not on the Bills based on the estimated reading ("ESTIMATED"). For more information, please see the category "FAQ’s".
34
x
Amount charged/credited in the “Estimated” Bill
Τhe amount charged/credited in the “Estimated” Bill (Bill based on estimated reading) is mentioned in this field.
35
x
Miscellaneous
It includes the rest of the charges referring to:
A) power supply  apart from the billing of consumed energy, regulated charges as well as charges of the “Estimated bill” amount and
 B) the charges rendered to the state 

Α)   Charges relevant to electricity usage
a)  charges resulting from selling generation power from photovoltaic systems.
b)  corrective registrations
c)  amounts rounded-off
d)  charges for works carried out on the Network (πχ. Meter check, rearrangement of supply points, blown fuses etc.)

Β)  Charges rendered to the state
a)   «ΕΦΚ (L.3336/05)» (Excise Duty): PPC collects the Excise Duty in the electricity bills and renders it to the State.  The Excise Duty is charged only to Bills based on actual reading (“ACTUAL”) and it is calculated based on consumption.
b)   «ΕΙΔ. ΤΕΛΟΣ 5‰ (SPECIAL DUTY 5‰) (L.2093/92)»: PPC collects the Special Duty in the electricity bills and renders it to the State. The Special Duty 5‰ is calculated in the Bills based on actual reading (“ACTUAL”) based on the consumed electricity increased by the Excise duty.

36
x
VAT
Total amount, VAT included, to be paid for electricity. It is noted that, Supply Charges, Regulated Charges and Excise duty and the rounded-off amounts as well as charges for third parties (Municipal fees, Municipal tax, Real Estate Tax & ERT) are not subject to VAT.
37
x
Municipal Charges
Charges for third parties (Municipal fees, Municipal tax, Real Estate Tax). The amounts for the Municipality are calculated in each Bill whether it is an Actual or an Estimated Bill. 

The amount is calculated as follows: 

a) For Municipal Fees (ΔΤ), Municipal Taxes (ΔΦ) : 
    (sq m of property) Χ (MF or MT coefficient) Χ (billing days) 
                                     365 days 

b) For Real Estate Tax (RET – ΤΑΠ) : 
    (sq m of property) Χ (zone price) Χ (age) Χ (RET coefficient) Χ (billing days) 
                                                365 ys 


38
x
ERT (Hellenic Broadcasting Corporation Societe Anonyme)
For ERT : 
    Annual charge for ERT x billing days 
                  365 days  

  1. 30. The following are included in the table:
    a) number of the meter and the type of indication (e.g. day or night).

    b) meter(s) indications the total consumption. 

    c)  Contractual Capacity (kVA):  as derived from the agreement of property connection with the network.  

    d) Transformation Coefficient: The coefficient is multiplied with the meter reading consumption in order to calculate the actual electricity consumption. If, for example, this coefficient is 40 and the measured consumption is 100, then, 4.000 kWh (=40X100) were consumed during the specific billing period. This refers to supplies with contractual capacity of over 85 kVA. 

    c) Power factor (cosφ): calculated for certain customer categories with high contractual capacity. It is calculated on the basis of the active and reactive energy usage. For all other customers, the power factor is considered to be equal to the unit (συνφ=1). 

    d) Chargeable Demand (KW): calculated for power supplies greater than 35 kVA and indicates the maximum power required for the specific billing period. 

  2. 31. Meter indications registration
    Information is provided referring to the period of time needed to register your meter indications (HEDNO’s service) so as to receive an Actual Bill and not an Estimated Bill.
  3. 32. PPC’s Supply Charges
    In this field, the electricity charges are calculated based on the electricity consumption and the tariff currently applied. That is, it includes the cost as well as the rest of the expenses for the electricity supply to customers. Electricity billing is included in the Bill based on the actual reading ("ACTUAL") and this is the reason why on the Bill based on estimated reading ("ESTIMATED"), this field is empty. For more information, please see the category "FAQ’s".
  4. 33. Regulated Charges
    Analysis of the charges applied to all customers using the National Electricity System, regardless of the electricity supplier selected. These charges include a) the use of the Transmission System (IPTO) b)the use of Electricity Distribution Network (HEDNO), b) Services of General Interest (SGI) and c) the special duty of Greenhouse Gas Emissions Reduction, destined to the development of green energy. The analysis of these charges is displayed only on the Bills based on actual reading ("ACTUAL") and not on the Bills based on the estimated reading ("ESTIMATED"). For more information, please see the category "FAQ’s".
  5. 34. Amount charged/credited in the “Estimated” Bill
    Τhe amount charged/credited in the “Estimated” Bill (Bill based on estimated reading) is mentioned in this field.
  6. 35. Miscellaneous
    It includes the rest of the charges referring to:
    A) power supply  apart from the billing of consumed energy, regulated charges as well as charges of the “Estimated bill” amount and
     B) the charges rendered to the state 

    Α)   Charges relevant to electricity usage
    a)  charges resulting from selling generation power from photovoltaic systems.
    b)  corrective registrations
    c)  amounts rounded-off
    d)  charges for works carried out on the Network (πχ. Meter check, rearrangement of supply points, blown fuses etc.)

    Β)  Charges rendered to the state
    a)   «ΕΦΚ (L.3336/05)» (Excise Duty): PPC collects the Excise Duty in the electricity bills and renders it to the State.  The Excise Duty is charged only to Bills based on actual reading (“ACTUAL”) and it is calculated based on consumption.
    b)   «ΕΙΔ. ΤΕΛΟΣ 5‰ (SPECIAL DUTY 5‰) (L.2093/92)»: PPC collects the Special Duty in the electricity bills and renders it to the State. The Special Duty 5‰ is calculated in the Bills based on actual reading (“ACTUAL”) based on the consumed electricity increased by the Excise duty.

  7. 36. VAT
    Total amount, VAT included, to be paid for electricity. It is noted that, Supply Charges, Regulated Charges and Excise duty and the rounded-off amounts as well as charges for third parties (Municipal fees, Municipal tax, Real Estate Tax & ERT) are not subject to VAT.
  8. 37. Municipal Charges
    Charges for third parties (Municipal fees, Municipal tax, Real Estate Tax). The amounts for the Municipality are calculated in each Bill whether it is an Actual or an Estimated Bill. 

    The amount is calculated as follows: 

    a) For Municipal Fees (ΔΤ), Municipal Taxes (ΔΦ) : 
        (sq m of property) Χ (MF or MT coefficient) Χ (billing days) 
                                         365 days 

    b) For Real Estate Tax (RET – ΤΑΠ) : 
        (sq m of property) Χ (zone price) Χ (age) Χ (RET coefficient) Χ (billing days) 
                                                    365 ys 


  9. 38. ERT (Hellenic Broadcasting Corporation Societe Anonyme)
    For ERT : 
        Annual charge for ERT x billing days 
                      365 days  

Direct Access to our Services

Contact us email phone


Corporate Social Responsibility and Sustainability Report 2016

TRSC


Download PPC application


Τα cookies επιτρέπουν μια σειρά από λειτουργίες που ενισχύουν την εμπειρία σας στον ιστότοπο dei.gr .

Χρησιμοποιώντας αυτόν τον ιστότοπο, συμφωνείτε με τη χρήση των cookies.